Basement finishing
A basement is often the largest unused space in a house. Finishing it means more than putting up walls: it has to be dry, warm, well lit and safe, and it has to work with the systems that already run through it.
The work
What is included
Checking for moisture before anything is built
Framing and insulation
Drywall and ceilings
Flooring
Lighting and electrical
Adding a bathroom
Egress and permit coordination where required
Step by step
How it works
Step 01
Look at the space
We check the basement for moisture, ceiling height, utilities and exits.
Step 02
Agree the plan
Rooms, layout and finishes, with the scope and price in writing.
Step 03
Build
Framing, rough-in, inspections where required, then walls, ceilings, floors and lighting.
Step 04
Walk it together
We go through the finished space with you.
FAQ
Questions people ask
Does a basement need to be dry before it is finished?
Yes. We look for signs of moisture first and tell you honestly if something has to be fixed before finishing.
Can you add a bathroom in the basement?
Often yes. It depends on where the drain is, and we check that during the visit.
Do you handle permits and exits?
Where a permit is required, we coordinate it. Rules vary by village, so we also tell you what to ask your village building department.
Also
Other services
Free estimate
Tell us about your project.
We will come back to you about the next step.